The second SWOT mission to Madagascar took place in April 2023. This 2023 mission was designed to test the SWOT satellite in its short 3-month phase of daily data production, from March to June 2023.The important equipment to equi
En savoir plus »The second SWOT mission to Madagascar took place in April 2023. This 2023 mission was designed to test the SWOT satellite in its short 3-month phase of daily data production, from March to June 2023.The important equipment to equi
En savoir plus »CNRE's infrastructure and know-how (WIODER team, then DiDEM/Deltas-Madagascar) were mobilised for the SWOT (System Water Ocean Technology) mission, which brought together 7 researchers from CNES, CNRS, INSU, IRD (LEGOS, SENS), CNR
En savoir plus »